In October 2021 the Kensington Association responded to the Arden Structural Plan which was prepared by the Victorian Planning Authority (VPA).

The submission begins as follows – the full submission can be access from the button below:-

Response to the Arden Structural Plan – October 2021Whilst the Kensington Association ‘field of action’ is primarily in the Macaulay precinct we have a strong ‘field of interest’ which extends easily into what happens in the Arden precinct. We look at the Arden Structural Plan (ASP) as a foreshadowing of what can happen in Macaulay.


Response to the Arden Structural Plan here